主管:中华人民共和国应急管理部
主办:应急管理部天津消防研究所
ISSN 1009-0029  CN 12-1311/TU

消防科学与技术 ›› 2020, Vol. 39 ›› Issue (8): 1100-1103.

• • 上一篇    下一篇

在建民用建筑火灾风险评估模型构建及应用

谢旭春1,2   

  1. 1. 珠海市消防救援支队,广东 珠海 519000;2. 中国矿业大学(北京)应急管理与安全工程学院,北京 100083
  • 出版日期:2020-08-15 发布日期:2020-08-15
  • 作者简介:谢旭春(1984-),男,湖南株洲人,中国矿业大学(北京)应急管理与安全工程学院硕士研究生,珠海市横琴新区消防救援大队指挥长,主要从事消防监督管理和火灾防控技术研究,广东省珠海市横琴新区香江路219号,519000。

Development and application of fire risk assessment model for civil buildings under construction

XIE Xu-chun1,2   

  1. 1. Zhuhai Fire and Rescue Division, Guangdong Zhuhai 519000, China; 2. School of Emergency Management and Safety Engineering, China University of Mining and Technology Beijing, Beijing 100083, China
  • Online:2020-08-15 Published:2020-08-15

摘要: 为客观评估在建民用建筑消防安全状况,构建并应用了一套实用性较强的火灾风险评估模型。分析在建民用建筑火灾特点以及致灾因素,构建在建民用建筑火灾风险综合评价体系。应用层次分析法确定各层级权重,利用模糊综合评价法进行综合评判,建立不同施工阶段在建民用建筑火灾风险评估模型。应用该模型对某在建民用建筑进行安全评估,指导火灾隐患整改,并对整改前后安全风险进行对比。评估结果表明,在建民用建筑最大风险因素为用火用电管理,此结论与实际状况较为相符。

关键词: 在建民用建筑, 火灾风险评估, 层次分析法

Abstract: In order to objectively evaluate fire risk of civil buildings under construction, this paper developed a practical fire risk assessment model. First, the paper analyzed fire characteristics and disaster factors of civil buildings under construction, and developed a comprehensive fire risk evaluation system for civil buildings under construction. Then, the Analytic Hierarchy Process was applied to determine the weight of each level, the fuzzy comprehensive evaluation method was used to make a comprehensive evaluation, and then the fire risk assessment model for civil buildings under construction at different construction stages has been built. Finally, the model was applied to evaluate the risk of a civil building under construction and to guide the rectification of fire hazard. The fire risk before and after the rectification have been compared. The evaluation results showed that the top risk factor of civil buildings under construction was the management of usage of fire and electricity, which was consistent with the actual situation.

Key words: civil building under construction, fire risk assessment;analytic hierarchy process, fuzzy comprehensive evaluation method