基于实体试验的电缆隧道中间接头区域防火措施研究

普子恒1,权 浪1,郭 卫2,周士贻2   

  1. (1.三峡大学 电气与新能源学院,湖北 宜昌 443002;2.国网北京电力科学研究院,北京 100075)
  • 出版日期:2023-04-15 发布日期:2023-04-15
  • 作者简介:普子恒(1987- ),男,三峡大学电气与新能源学院副教授,博士,主要从事高压电器设备绝缘试验技术、输电线路智能运维方面的研究工作,湖北省宜昌市西陵区大学路8号,443002。
  • 基金资助:
    :国家自然科学基金青年科学基金项目(51607103)

Study on fire prevention measures in the middle joint area of cable tunnel based on physical test

Pu Ziheng1, Quan Lang1, Guo Wei2, Zhou Shiyi2   

  1. (1. College of Electrical Engineering & New Energy, China Three Gorges University, Hubei Yichang 443002, China; 2. Beijing Electric Power Research Institute, State Grid, Beijing 100075, China)
  • Online:2023-04-15 Published:2023-04-15

摘要: 为测试实际隧道中的中间接头区域的防火措施效果,进一步优化配置,设计点火装置和数据采集系统,利用一条待投运的电缆隧道开展实体火灾试验,通过监测图像和数据分析中间接头区域燃烧的火灾发展情况,然后对不同配置下的防灭火效果进行测试分析。结果表明:模拟中间接头击穿破裂故障下的燃烧,温度高且容易产生滴落熔融物,现有防护措施下故障接头周边电缆仍可能受到损伤。优化配置措施为:在中间接头区域上下层都加装防火隔板;在中间接头所在的最上一层支架距电缆接头中心线两侧1 m处各安装一个4 kg的超细干粉灭火装置;对电缆中间接头两侧4 m范围内电缆绕包防火包带,可有效防护中间接头区域火灾。

关键词: 电缆隧道火灾, 中间接头故障, 实体火灾试验, 防火效果

Abstract: In order to test the effect of fire prevention measures in the middle joint area of the actual tunnel, and further optimize the configuration, a cable tunnel to be put into operation was used to conduct physical fire test. The ignition device and data acquisition system were designed and applied in this paper. The fire development in the intermediate joint area was analyzed by monitoring images and data. Then the fire prevention and extinguishment effects under different configurations were tested and analyzed. The results show that the combustion of the simulated intermediate joint under the breakdown and fracture fault has high temperature and is easy to produce dripping melt. Under the existing protective measures, the cables around the faulty connector may still be damaged. The optimized configuration measures are as follows: The upper and lower layers of the intermediate joint area shall be equipped with fire barriers; A 4 kg superfine dry powder fire extinguishing device shall be installed at the top support where the intermediate connector is located and 1 m from both sides of the cable connector centerline; Wrap the cable within 4 meters on both sides of the cable intermediate joint with fireproof tape, which can effectively prevent the fire in the intermediate joint area.

Key words: cable tunnel fire, intermediate joint failure, physical fire test, fire prevention effect