330 kV变电站主变消防能力提升方案及实施方法探讨

刘磊, 李世军, 安旺成, 王浩田   

  1. (国网甘肃省电力公司定西供电公司,甘肃 定西 744300)
  • 收稿日期:2025-04-18 修回日期:2025-08-12 出版日期:2026-01-15 发布日期:2026-01-15
  • 作者简介:刘 磊,国网甘肃省电力公司定西供电公司工程师,主要从事电气工程及其自动化方面的研究,甘肃省定西市安定区和平街5号,744300,451528296@qq.com。
  • 基金资助:
    国网甘肃省电力公司定西供电公司自立项目(SGGSSDXSSBJS2401216)

Discussion on the improving scheme and implementation method for fire protection capability of the main transformer in a 330 kV substation

Liu Lei, Li Shijun, An Wangcheng, Wang Haotian   

  1. (State Grid Gansu Electric Power Company Dingxi Power Supply Company, Dingxi Gansu 744300, China)
  • Received:2025-04-18 Revised:2025-08-12 Online:2026-01-15 Published:2026-01-15

摘要: 为了提升330 kV变电站主变消防能力,保障电网安全,分析了330 kV变电站主变压器消防设施配置现状和不足,对比了固定式泡沫喷雾灭火系统、压缩空气泡沫灭火系统、泡沫细水雾涡扇炮灭火系统、消防机器人灭火系统4种主变消防能力提升方案的优缺点,确定消防机器人灭火系统较适合330 kV变电站主变消防能力提升,并提出一种智能化泡沫喷雾涡扇炮消防机器人灭火系统。试验表明,智能化泡沫喷雾涡扇炮消防机器人灭火系统6 min扑灭油池火,6.7 min扑灭变压器和散热器顶部表面火,约7.2 min扑灭套管喷雾火,成功控制火势,9.5 min扑灭全部明火,无复燃发生。设计了典型330 kV变电站主变灭火系统方案,为后续330 kV和500 kV变电站主变消防能力提升改造工程和新建变电站主变消防系统设计提供参考。

关键词: 330 kV变电站, 消防能力提升方案, 消防机器人, 灭火系统

Abstract: In order to improve the fire protection capacity of the main transformer of 330 kV substation and ensure the safety of the power grid, the paper analyzes the current situation and shortcomings of the fire protection facilities configuration of the main transformer of 330 kV substation, compares the advantages and disadvantages of four main transformer fire protection capacity improvement schemes, namely, fixed foam spray fire extinguishing system, compressed air foam fire extinguishing system, foam water mist vortex fan fire extinguishing system, and robot fire extinguishing system, determines that the robot fire extinguishing system is more suitable for the fire protection capacity improvement of the main transformer of 330 kV substation, and proposes an intelligent foam spray vortex fan robot fire extinguishing system. The test shows that the intelligent foam spray turbofan monitor robot extinguishing system puts out the oil pool fire in 6 minutes, the transformer and radiator top surface fire in 6.7 minutes, the casing spray fire in 7.2 minutes, successfully controls the fire, and extinguishes all open fires in 9.5 minutes without reburning. A typical fire extinguishing system scheme for the main transformer of a 330 kV substation has been designed, providing reference for the subsequent improvement and renovation projects of the fire protection capabilities of the main transformers in 330 kV and 500 kV substations, as well as the design of the fire extinguishing system for new substations.

Key words: 330 kV substation, improving scheme for fire protection capability, fire robots, fire extinguishing system