主管:中华人民共和国应急管理部
主办:应急管理部天津消防研究所
ISSN 1009-0029  CN 12-1311/TU

Fire Science and Technology ›› 2025, Vol. 44 ›› Issue (6): 776-782.

Previous Articles     Next Articles

Study on heat insulation effect of high pressure fire water curtain on bucket-type residential building

Hu Cheng1, Cong Weiqing2, Wang Qixuan3, Li Junmei4, Ma Jing3, Li Chang3, Chen Shu3, Wang Yilin3   

  1. (1. Institute of Urban Safety and Environmental Science, Beijing Academy of Science and Technology, Beijing 100054, China; 2. Beijing Key Station Area Management Commission, Beijing 100055, China; 3. School of Urban Construction, Beijing City University, Beijing 101300, China; 4. College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China)
  • Received:2024-06-11 Revised:2024-07-25 Online:2025-06-24 Published:2025-06-15

Abstract: As an area where multiple transportation modes converge, the underground transfer hall of railway stations poses challenges to emergency evacuation due to its complex spatial layout and highly dense pedestrian flow, especially when secondary security inspection facilities are newly introduced during subway-to-railway transfers, which may significantly affect evacuation efficiency. Taking the underground transfer hall of a station in Beijing as a case study, this paper analyzes the occupancy of evacuation exit space by security inspection facilities, and constructs a targeted evacuation safety risk assessment method by integrating the characteristics of transfer passenger flow, spatial functional zoning, and evacuation safety standards. Through simulating typical evacuation scenarios, the paper quantitatively evaluates the changes in evacuation time before and after the implementation of security inspections. The results show that the evacuation time meets safety requirements (5.38 min) without security inspections, while it exceeds the standard (>6 min) after the addition of security inspections, indicating that the security inspection facilities occupy evacuation channels and compromise evacuation safety in emergencies such as fires. Consequently, improvement measures are proposed, including reducing commercial areas, optimizing pedestrian flow guidance, assisting passengers with large luggage, and adjusting the layout of security inspection areas.

Key words: railway passenger station, underground transfer hall, secondary security check, emergency exit, evacuation safety, risk assessment