Urgent problems and countermeasures for fire inspection in railway construction projects

Gao Yanfeng   

  1. (China Railway Zhengzhou Group Co., Ltd., Zhengzhou Henan 450006, China)
  • Received:2024-06-11 Revised:2024-09-08 Online:2025-04-15 Published:2025-04-15

Abstract: Combined with the transfer of the responsibility of fire protection design review and acceptance of railway construction projects from the railway public security and fire protection departments to local housing and construction departments, the problems encountered in the fire protection design review and acceptance and filing of railway construction projects were comprehensively compared and analyzed, the main problems to be solved and the reasons for their existence were analyzed, and corresponding solutions were put forward from the aspects of project planning procedures, design drawing review, special fire protection design review, overall fire protection acceptance assessment and filing. This paper clarifies the corresponding policy change requirements of railway construction projects in the process of fire protection design verification, and provides effective solutions for promoting the smooth implementation of railway construction projects.

Key words: railway construction engineering, fire protection design, review and acceptance