主管:中华人民共和国应急管理部
主办:应急管理部天津消防研究所
ISSN 1009-0029  CN 12-1311/TU

Fire Science and Technology ›› 2026, Vol. 45 ›› Issue (5): 127-131.

Previous Articles     Next Articles

Fire risks and fire prevention strategies for core process flow in LNG receiving terminals

Zheng Yifeng1,Zhang Lin1,Chen Zibin2   

  1. (1. Fuzhou Fire and Rescue Division, Fuzhou Fujian 350001, China; 2. CNOOC Fujian Natural Gas Co., Ltd., Putian Fujian 351156, China)
  • Received:2026-01-07 Revised:2026-02-09 Online:2026-05-15 Published:2026-05-15

Abstract: Based on the key processes of LNG receiving terminals, this paper focuses on the fire safety analysis during process operation. Firstly, the properties of liquefied natural gas (LNG) and the current situation of the domestic LNG industry are introduced, followed by an emphasis on the important role of LNG receiving terminals in the energy supply chain. Taking an LNG receiving terminal—the first one independently introduced, constructed and managed in China—as a case study, the potential fire hazards in key process flows such as ship unloading, storage and BOG treatment are discussed, with its Class A hazard level and potential risks including pool fires and jet fires identified. Furthermore, starting from facility design, an "intelligent + integrated" fire prevention system is established, and a management closed loop featuring "responsibility + system" is improved. Corresponding preventive measures are proposed to provide references for the safe operation of LNG receiving terminals.

Key words: LNG receiving terminal, fire risk, fire prevention technology